PMP考試每天一練-2020年P(guān)MP考試練習(xí)題145

轉(zhuǎn)載者:PMP團(tuán)購網(wǎng)      發(fā)布時間:2020/11/2        點(diǎn)擊: 2476

PMP考試練習(xí)題一:

During project execution, a project falls behind schedule. After evaluating options, the project manager concludes that temporarily collocating the most active virtual team members could bring the project back on schedule.What is the project manager doing?

A. Developing the project team

B. Managing the project team

C. Optimizing the project team

D. Balancing the project team

在項目執(zhí)行期間,一個項目落后于進(jìn)度計劃。在評估方案之后,項目經(jīng)理得出結(jié)論,暫時讓最活躍的虛擬團(tuán)隊成員集中辦公能讓項目恢復(fù)進(jìn)度計劃。項目經(jīng)理執(zhí)行的是下列哪一項?

A.建設(shè)項目團(tuán)隊

B.管理項目團(tuán)隊

C.優(yōu)化項目團(tuán)隊

D.平衡項目團(tuán)隊

PMP考試答案解析:集中辦公是建設(shè)項目團(tuán)隊的工具。

PMP考試參考答案:A

PMP考試練習(xí)題二

A team member versa unable to attend the last project review meeting. The project manager confirms with the team reamer by phone that the project icon track and on budget. What should the team member consult to determine what task to perform next?

A. Activity management plan

B. Task management plan

C. Project schedule

D. Project calendar

一名團(tuán)隊成員不能夠參加上一次項目評審會。項目經(jīng)理用電話與該名團(tuán)隊成員確認(rèn)項目符合進(jìn)度和預(yù)算。團(tuán)隊成員應(yīng)查閱下列哪一項來確定下一步要執(zhí)行什么任務(wù)?

A.活動管理計劃

B.任務(wù)管理計劃

C.項目進(jìn)度計劃

D.項目章程

PMP考試答案解析:從項目進(jìn)度計劃中查看活動的開始、結(jié)束以及持續(xù)時間,活動間的邏輯關(guān)系等。

PMP考試參考答案:C

閱讀本文的人還閱讀了:
pmp證書有含金量嗎?
在國內(nèi)PMP有多少含金量?
PMP證書含金量淺析
大專文憑可以報考pmp嗎?
pmp是什么的縮寫?
pmp是什么職位的簡稱?
pmp是什么意思的縮寫?

網(wǎng)站sitemap

色婷婷激情综合,久久综合九色99,91亚洲精品久久久蜜桃网站,欧美日韩国产美女

PMP團(tuán)購導(dǎo)航
遠(yuǎn)程PMP團(tuán)購
北京PMP團(tuán)購
上海PMP團(tuán)購
廣州PMP團(tuán)購
深圳PMP團(tuán)購
江浙PMP團(tuán)購
西部PMP團(tuán)購
其他城市團(tuán)購



PMP題庫
主站蜘蛛池模板: 武平县| 罗定市| 水城县| 阿尔山市| 邵阳县| 北海市| 临洮县| 淮南市| 那坡县| 沙湾县| 离岛区| 霞浦县| 长汀县| 阳春市| 辉县市| 五峰| 筠连县| 唐河县| 湖北省| 商河县| 泽普县| 紫阳县| 高安市| 上林县| 万年县| 黄陵县| 蒙自县| 晋宁县| 古交市| 邯郸市| 贵南县| 霍山县| 安塞县| 广丰县| 仁寿县| 乐安县| 襄城县| 边坝县| 昭苏县| 淳安县| 诸城市|