全國(guó)

[切換城市]

以下城市均已開(kāi)通:
關(guān)閉
當(dāng)前位置:PMP團(tuán)購(gòu)網(wǎng) > PMP考試資料 > 正文

PMP考試模擬題(9)

轉(zhuǎn)載者:PMP團(tuán)購(gòu)網(wǎng)      發(fā)布時(shí)間:2012/7/5        點(diǎn)擊: 3708

1. Currency fluctuations, political instability, and competition from national and regional governments and special interest groups can interfere with project management of international projects. Project managers for international projects should recognize the primary factors in cross-cultural settings and place special emphasis on

  A. Establishing a performance reporting system

  B. Developing a system to manage communications

  C. Establishing and following a production schedule for information distribution to avoid responding to requests for in formation between scheduled communications

  D. Using translation services for formal, written project reports

  1. 幣值波動(dòng)、政治動(dòng)蕩、中央和地方政府之間的競(jìng)爭(zhēng),以及不同利益集團(tuán)之間的沖突會(huì)干擾國(guó)際項(xiàng)目的管理。管理國(guó)際項(xiàng)目的項(xiàng)目經(jīng)理應(yīng)該意識(shí)到跨文化環(huán)境的主要影響因素,并特別重視:

  A. 建立績(jī)效報(bào)告制度

  B. 建立溝通管理系統(tǒng)

  C. 建立和執(zhí)行產(chǎn)生進(jìn)度表以方便信息分配,避免在定期會(huì)面之間出現(xiàn)情況的變化

  D. 通過(guò)翻譯服務(wù)起草正式的報(bào)告

  2. You are working to close out your project. During these hectic final days of the project most conflict arises form-

  A. Schedule problems

  B. Cost overruns

  C. Technical problems

  D. Lack of customer acceptance

  2. 你目前正忙著做項(xiàng)目的收尾工作。在令人興奮的最后階段,在下列哪個(gè)方面最容易引發(fā)沖突

  A. 進(jìn)度問(wèn)題

  B. 成本超支

  C. 技術(shù)問(wèn)題

  D. 缺乏客戶的認(rèn)同

  3. A person estimates that a commute will most likely take I hour. On further questioning, she estimates that the trip could take as little as 45 minutes, best case, or as long as I hour 45minutes, worst case, what is the standard deviation based on the estimates?

  A. 10 minutes

  B. 15minutes

  C. 50 minutes

  D. 60 minutes

  3. 一個(gè)人估計(jì)她回家最可能的情況是花1小時(shí)間。她又進(jìn)一步推算,在最快情況下要45分鐘,最慢要1小時(shí)45分鐘。基于這樣的估計(jì),這個(gè)人回家所花的時(shí)間的標(biāo)準(zhǔn)差是多少

  A. 10分鐘

  B. 15分鐘

  C. 50分鐘

  D. 60分鐘

  4. Projects are particularly susceptible to risk because

  A. Murphy's law stated that “if something can go wrong, it will‘”

  B. Each project is unique in some measure

  C. Project management tools are generally unavailable at the project team level

  D. There are never enough resources to do the job

  4. 由于以下哪個(gè)原因,項(xiàng)目特別容易受到風(fēng)險(xiǎn)的影響:

  A. 墨菲定律表明:“如果可能會(huì)生問(wèn)題,問(wèn)題將會(huì)出現(xiàn)”

  B. 每個(gè)項(xiàng)目在某些方面是獨(dú)特的

  C. 項(xiàng)目管理工具對(duì)于項(xiàng)目小組是不可得的

  D. 完成工作的資源永遠(yuǎn)是不足的

  答案:B

  項(xiàng)目的特征-獨(dú)特的產(chǎn)品、服務(wù)或成果:

  關(guān)于項(xiàng)目的特征--獨(dú)特性“

  5. What doctrine causes a party to relinquish rights under a contract because it knowingly fails to execute those rights?

  A. Assignment of claims

  B. Matebal breach

  C. Waiver

  D. Warranties

  5. 根據(jù)什么理論,使得當(dāng)事一方由于有意不實(shí)施合同權(quán)利而放棄一個(gè)合同下的權(quán)利?

  A. 權(quán)利轉(zhuǎn)讓

  B. 嚴(yán)重違約

  C. 自動(dòng)棄權(quán)

  D. 授權(quán)

網(wǎng)站sitemap

色婷婷激情综合,久久综合九色99,91亚洲精品久久久蜜桃网站,欧美日韩国产美女

PMP團(tuán)購(gòu)導(dǎo)航
遠(yuǎn)程PMP團(tuán)購(gòu)
北京PMP團(tuán)購(gòu)
上海PMP團(tuán)購(gòu)
廣州PMP團(tuán)購(gòu)
深圳PMP團(tuán)購(gòu)
江浙PMP團(tuán)購(gòu)
西部PMP團(tuán)購(gòu)
其他城市團(tuán)購(gòu)



PMP題庫(kù)
主站蜘蛛池模板: 靖西县| 宝山区| 河池市| 民和| 霍邱县| 攀枝花市| 叶城县| 彩票| 临洮县| 丘北县| 兴和县| 吴江市| 曲阳县| 天门市| 保康县| 庆安县| 当雄县| 和龙市| 米泉市| 韩城市| 牡丹江市| 皋兰县| 安顺市| 定南县| 成都市| 嘉荫县| 南丰县| 三门县| 靖安县| 白朗县| 东方市| 嘉峪关市| 屏山县| 交城县| 临江市| 邓州市| 黄大仙区| 嘉义县| 宁蒗| 甘德县| 改则县|