第11章PMP練習題-第六部分(PMP認證考試系列)

轉載者:PMP團購網      發布時間:2014/1/30        點擊: 4706

47.High-risk projects are always of concern to senior management and will receive the most scrutiny. The major concern of the project manager of a high risk project
is the tendency for senior management to often:
高風險項目通常會受到高層管理者的關注以及最為細致的審查。高風險項目的項目經理最大的顧慮是高層管理者常常會:
A.妨礙或干預項目管理
B.規避或否認項目潛在的風險
C.給與資源配置低優先權
D.在要求額外資源時支持項目
參考答案:A

48. Workarounds are determined during which step of risk management?
權變措施的確定是在風險管理的哪個步驟中
A.風險識別
B.風險定性分析
C.風險應對規劃
D.控制風險
參考答案:D。

49. Which of the following is NOT a Perform Qualitative Risk Analysis technique?
以下哪項不是實施定性風險分析的技術?
A. 風險分類
B. 圖解技術
C. 風險概率和影響評估
D. 風險緊迫性評估
參考答案:B。

50. You have just been assigned as the project manager for a new telecommunications project. There appear to be many risks on this project, but no one has evaluated them to assess the range of possible project outcomes. What needs to be done?
你被委任為項目經理,負責一個新的通訊項目。項目看上去有很多風險,但還沒人對此評論,以評估項目結果可能的變化范圍。現在需要做什么?
A. 識別風險
B. 風險量化
C. 風險應對規劃
D. 風險監控
參考答案:A。先識別風險

51.After the conformation of design specification with the client, a contractor has made a FFP contract with the client. Due to insufficient funding by the contractor, The contractor started the project three months later. The contractor shall
在與客戶構造了設計規范后,承包商與客戶簽訂了一份固定總價合同,由于承包商資金不足,所以在三個月后才開始這項目,承包商應該:
A.實施風險管理計劃
B.與客戶談判項目完成里程碑
C.為使項目準時完成,增加資源
D.利用管理儲備
參考答案:A

52.Purchasing insurance is an example of risk:
采購保險單是采取何種風險應對策略的一個例子
A. 緩解
B. 轉移
C. 接受
D. 回避
參考答案:B。

色婷婷激情综合,久久综合九色99,91亚洲精品久久久蜜桃网站,欧美日韩国产美女

PMP團購導航
遠程PMP團購
北京PMP團購
上海PMP團購
廣州PMP團購
深圳PMP團購
江浙PMP團購
西部PMP團購
其他城市團購



PMP題庫
主站蜘蛛池模板: 广州市| 舒兰市| 宜兴市| 永川市| 明光市| 鄂州市| 资中县| 腾冲县| 碌曲县| 上杭县| 惠安县| 平江县| 商都县| 琼中| 丹东市| 汕尾市| 塔河县| 西和县| 芮城县| 修文县| 漳浦县| 开鲁县| 洪江市| 辽源市| 灵川县| 丹寨县| 化隆| 如皋市| 库尔勒市| 杨浦区| 温泉县| 赣州市| 佛学| 桐柏县| 岳普湖县| 麟游县| 莱芜市| 明光市| 福贡县| 彰武县| 泽州县|