PMP考試練習題目(21-25)-項目溝通管理
項目溝通管理-PMP考試章節練習(21-25題) 21. One of the engineers on your team performs a presentation to a perspective client about a proposed design. In answering questions, the engineer reveals that she does not agree with the way in which this system is engineered during the presentation. What are your options as project manager of the engineer, listening to the presentation? 你的項目團隊中的一位工程師對一個客戶建議的設計進行了一次介紹。在回答問題時, 工程師表示他對系統的設計是不同意的。你作為這個工程師的項目經理在聽了介紹后如何反應? 22. It is a few months before the project is scheduled to end. Carol was just hired to take the place of Bob who has moved on to a new assignment. Neither you nor anyone on your team has worked with Carol until now. What type of meeting should take place to introduce Carol to her new responsibilities and handoff of the ongoing work? 還有幾個月項目就要完成了。Carol 被委派到項目中來代替Bob 的工作,Bob 分配到新的任務中去了。你和你們團隊中的其他人都沒有和Carol 一起工作過。在這種情況下開什么類型的會來向Carol 介紹他的新任務并進行工作的移交? 23. You are managing a large project that requires part of your project team to live in other countries with vast differences in time zones. There are a large number of your project team members that are also scattered around a large geographical region of your country. Select the best method of team communications from the items listed below. 你在管理一個大型的項目,這個項目需要部分項目團隊成員住在分散的地區中。項目團隊中的大部分成員也分布在你們國家的其他地方。從下面選擇出一種團隊溝通的最佳方法。 24. The project or phase, after either achieving its objectives or being terminated for other reasons, requires______________ 在項目或階段完成其目的或者因為其他原因被中止之后,需要_____________ 25. Performance of progress reports organize and summarize the information gathered and present the results of any analysis. What document should formalize the information required for the performance report? 進度報告的編制組織并總結了任何分析結果和所收集的信息。需要什么文檔來規格化這個報告? PMP考試練習答案(溝通管理):21-25 CDBAB |