PMP考試每天一練-2023年P(guān)MP考試模擬題9
PMP考試練習(xí)題一: 進(jìn)行自制或外購(gòu)分析后,項(xiàng)目經(jīng)理將已經(jīng)包含工作分解結(jié)構(gòu)(WBS)中的內(nèi)容進(jìn)行外包,項(xiàng)目經(jīng)理應(yīng)該采取下列哪一項(xiàng)措施? After a make-or-buy analysis, the project manager decided to outsource the deliverables that included in the work breakdown structure (WBS). Which of the following should the project manager do next? A:將需要外包的可交付成果從WBS中移除。 Remove deliverables from the WBS that will be outsourced. B:將需要外包的可交付成果保留在WBS中。 Maintain in the WBS the deliverables that will be outsourced. C:創(chuàng)建另一個(gè) WBS,僅包含將需要外包的可交付成果。 Create another WBS includes only the deliverables that will be outsourced D:等到選定外包供應(yīng)商后才對(duì) WBS 進(jìn)行更改 Don’t change anything of the WBS until the outsourcing provider is selected PMP考試答案解析:所屬過程組:規(guī)劃過程組。所屬知識(shí)領(lǐng)域:項(xiàng)目范圍管理。WBS 是對(duì)項(xiàng)目團(tuán)隊(duì)為實(shí)現(xiàn)項(xiàng)目目標(biāo)、創(chuàng)建可交付成果而需要實(shí)施的全部工作范圍的層級(jí)分解。外包的可交付成果仍然是項(xiàng)目目標(biāo)的組成部分所以不應(yīng)該移除 PMP考試參考答案:B PMP考試練習(xí)題二: 在項(xiàng)目進(jìn)度網(wǎng)絡(luò)圖中,你可以發(fā)現(xiàn)多種時(shí)差。在某特定活動(dòng)中被使用且不影響任何后續(xù)活動(dòng)最早開始時(shí)間的時(shí)差被稱為: A.內(nèi)部時(shí)差 B.自由時(shí)差 C.總時(shí)差 D.項(xiàng)目時(shí)差 PMP考試參考答案:B |