PMP考試每天一練-2023年P(guān)MP考試模擬題26

轉(zhuǎn)載者:PMP團購網(wǎng)      發(fā)布時間:2023/2/24        點擊: 626

PMP考試練習(xí)題一:

由于一臺設(shè)備設(shè)計規(guī)格中的某一項被忽略了而導(dǎo)致項目延期,而趕制此項需要更長的交貨期。為避免這種情況的發(fā)生,項目經(jīng)理在項目規(guī)劃期間應(yīng)完成下列哪一項?

A project is delayed because one item in the equipment specification has been ignored. It will require a longer lead time to catch up. To avoid this situation, the project manager should have done which of the following in project planning?

A:A 制定應(yīng)急計劃

prepare a contingency plan

B:選擇更為可靠的供應(yīng)商

select a more reliable supplier

C:在識別風(fēng)險過程上花費更多的努力

spend more efforts on the process of risk identification

D:確保該項不在關(guān)鍵路徑上

ensure that the item is a not on the critical path

PMP考試答案解析:所屬過程組:規(guī)劃過程組。所屬知識領(lǐng)域:項目風(fēng)險管理。出現(xiàn)這種情況識別風(fēng)險不充分。

PMP考試參考答案:C

PMP考試練習(xí)題二:

以下哪項不是用于進(jìn)度控制的工具或技術(shù)?

A.偏差分析

B.三點估算

C.假設(shè)情景分析

D.資源平衡

PMP考試參考答案:B

閱讀本文的人還閱讀了:
PMP考試成績通知是什么樣的?
pmp認(rèn)證的級別?
pmbok第七版免費下載
PMP考試費用及繳費方式是什么?
pmp考試時間幾點到幾點?
PMP考試費用為什么這么貴?
pmbok第七版中文版下載
pmp認(rèn)證考試是什么?
PMP考試成績是什么?

網(wǎng)站sitemap

色婷婷激情综合,久久综合九色99,91亚洲精品久久久蜜桃网站,欧美日韩国产美女

PMP團購導(dǎo)航
遠(yuǎn)程PMP團購
北京PMP團購
上海PMP團購
廣州PMP團購
深圳PMP團購
江浙PMP團購
西部PMP團購
其他城市團購



PMP題庫
主站蜘蛛池模板: 泗洪县| 娄烦县| 文山县| 阿坝| 秭归县| 斗六市| 南京市| 宁南县| 密山市| 洛南县| 盖州市| 调兵山市| 尉氏县| 会昌县| 巩留县| 元江| 定襄县| 全南县| 梨树县| 同江市| 襄垣县| 通河县| 栖霞市| 尼木县| 利津县| 五大连池市| 紫金县| 汤阴县| 邹平县| 临夏市| 黄龙县| 孝感市| 乌拉特后旗| 彰化市| 唐河县| 大悟县| 余干县| 佳木斯市| 南京市| 延安市| 固阳县|