PMP試題1. Buyers use a variety of methods to provide incentives to a seller to complete work early or within certain contractually specified time frames. One such incentive is the use of liquidated damages. From the seller's perspective, liquidated damages are what form of incentive?
a. Positive
b. Negative
c. Nomi
d. Reverse
e. Risk-prone
買(mǎi)主使用各種方法以使承包商更早的或在某些契約指定時(shí)間框架內(nèi)完成工作。一種方式是清算賠償金的應(yīng)用,從承包商的觀點(diǎn)看,清算賠償金是那一種類(lèi)型的激勵(lì)?
a. 積極地
b. 消極地
c. 輕微地
d. 反面地
e. 風(fēng)險(xiǎn)傾向地


PMP試題2. Payment bonds are often required by the contract and require specific actions under the stated conditions. Payment bonds are specifically designed to ensure that the prime contractor provides payment of
a. Insurance premiums
b. Weekly payrolls
c. Incremental earnec
d. Subcontractors, laborers, and suppliers of material
e. Damages for accidents caused
在合同中通常需要付款保函,同時(shí)在所陳述的情況下需要采取特別措施。付款保函是專(zhuān)門(mén)用于保證為主要承包商提供什么樣的付款
a. 保險(xiǎn)費(fèi)
b. 每周的薪水
c. 增加所得
d. 轉(zhuǎn)包商、勞動(dòng)力和原料供應(yīng)l
e. 意外事故造成的損失


pmp大禮包


PMP試題3. When a seller breaches a contract, the buyer cannot receive
a. Compensatory damages
b. Punitive damages
c. Specific performance
d. Liquidated damages
e. All the above
當(dāng)承包商違反合同,購(gòu)買(mǎi)者不能得到
a. 補(bǔ)償性的賠償金
b. 懲罰性的賠償金
c. 特殊的執(zhí)行
d. 清算賠償金
e. 上述所有


PMP試題4. The contracting function in an organization is considered to be decentralized when-
a. Each project manager has control over the contracting process for his or her project
b. The project manager controls contract award
c. The contracting person appointed to the project is available and under the project manager's direct control
d. Contracting is tailored to a single project
e. All above
在什么時(shí)候,組織內(nèi)合同的功能可以被分散考慮-
a. 每個(gè)項(xiàng)目經(jīng)理都他的/她的項(xiàng)目的合同程序
b. 項(xiàng)目經(jīng)理控制著合同的獎(jiǎng)勵(lì)
c. 在項(xiàng)目經(jīng)理的直接領(lǐng)導(dǎo)下,可用指定的項(xiàng)目合同人
d. 合同針對(duì)單個(gè)項(xiàng)目
e. 上述所有


PMP試題5. Which of the following terms represents a contract type category?
a. Fixed-price
b. Cost-reimbursement
c. Unit-price
d. a & b
e. a, b, & c
下列那一個(gè)描述了合同的類(lèi)型?
a. 固定價(jià)
b. 成本補(bǔ)償
c. 單元價(jià)
d. a 和 b
e. a, b, 和 c



附件:完整PMP考試200道題下載(點(diǎn)擊鏈接)

 

閱讀本文的人還閱讀:

pmp考試內(nèi)容及題量?
PMP考試有題庫(kù)嗎?
PMP考試內(nèi)容及例題?
PMP考試試題是什么樣?
PMP考試題型是什么?

PMP十萬(wàn)個(gè)為什么

+ PMP證書(shū)的價(jià)值
+ PMP入門(mén)知識(shí)
+ PMP報(bào)考條件
+ PMP認(rèn)證流程
+ PMP考試知識(shí)
+ PMP教材和PMP培訓(xùn)
+ PMP續(xù)證和PDU學(xué)分
+ PMP其他

PMP熱門(mén)問(wèn)題匯總

  1. 33528 次閱讀:
    PMP報(bào)名時(shí)間是哪天?
  2. 31521 次閱讀:
    PMP考試費(fèi)用是多少?
  3. 23165 次閱讀:
    PMP考試時(shí)間是什么?
  4. 13689 次閱讀:
    PMP考試報(bào)名條件是什么?
  5. 3517 次閱讀:
    PMP考試通過(guò)率是多少?
主站蜘蛛池模板: 都匀市| 武隆县| 桂东县| 巴彦县| 铜陵市| 信阳市| 河东区| 商洛市| 那坡县| 新和县| 进贤县| 二手房| 红安县| 平顺县| 通榆县| 庆安县| 鞍山市| 阜南县| 大埔区| 尼玛县| 兴化市| 从江县| 会同县| 惠来县| 康平县| 亳州市| 余干县| 华安县| 冷水江市| 铜山县| 西华县| 南平市| 百色市| 龙海市| 驻马店市| 武义县| 大连市| 叶城县| 洞头县| 措美县| 荃湾区|